ALFRED TEMILE 10 (IMO 9937127)
ALFRED TEMILE 10 is a LPG Tanker built in 2024 and flying the Bermuda flag, placing it in its 2nd year of service. The vessel reports a deadweight tonnage of 18,417 metric tonnes and a gross tonnage of 17,974. This vessel is configured for the transport of liquefied petroleum gas. ALFRED TEMILE 10 is classed by Lloyd's Register, which is a member of the International Association of Classification Societies (IACS). The vessel has been observed in West Africa and the Mediterranean Sea. It has previously operated under one former name and one former flag. Over the last 36 months it has had 3 port state control (PSC) inspections and no detentions. The most recent inspection was on 17 October 2025.
- Type: LPG Tanker
- Flag: Bermuda
- Year built: 2024
- MMSI: 310842000
- Call sign: ZCHF4
- Gross tonnage: 17974
- Deadweight: 18417 t
- Port State Control (PSC) inspections: 3 since 2024
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 17/10/2025
- Registered owner: LPG ALFRED TEMILE LTD (Nigeria)
- Ship manager: EA TEMILE & SONS DEV CO LTD (Nigeria)
- Last AIS position: 5°32.2′N · 005°41.4′E · Speed 1.9 kn · received 14 September 2026 at 17:53 UTC
- Destination: Warri (NG WAR)
- Arrival alert: rynda.io messages you by email or in Telegram when ALFRED TEMILE 10 arrives in Warri. Free for up to 3 vessels.
Frequently asked questions
What is the vessel type and age of ALFRED TEMILE 10?
ALFRED TEMILE 10 is an LPG Tanker built in 2024. It is currently in its 2nd year of service.
What are the tonnage specifications for ALFRED TEMILE 10?
The vessel has a deadweight tonnage of 18,417 metric tonnes. Its gross tonnage is recorded at 17,974.
Which classification society manages ALFRED TEMILE 10?
The vessel is classed by Lloyd's Register, which is an IACS member. Its current classification status is listed as Delivered.
Where has ALFRED TEMILE 10 been operating recently?
The vessel has been observed in West Africa and the Mediterranean Sea. These regions represent its most recent recorded geographic areas.
How many PSC inspections has the vessel undergone?
Over the last 36 months it has had 3 port state control (PSC) inspections and no detentions, with 9 deficiencies recorded. The most recent inspection was on 17 October 2025. All-time records show 3 inspections since 2024 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.