ARACHTHOS I (IMO 9935143)
ARACHTHOS I is a Crude Oil Tanker built in 2023 and flying the Liberia flag, placing it in its third year of service. The vessel reports a deadweight tonnage of 115,198 metric tonnes and a gross tonnage of 62,955. This capacity is characteristic of tankers used for significant crude oil transport operations.
ARACHTHOS I is classed by DNV, which is a member of the International Association of Classification Societies (IACS). The vessel has been observed in the Mediterranean Sea, West Africa, and the Gulf of Mexico over recent periods. It has previously operated under one former name and one former flag. Over the last 36 months it has had 3 port state control (PSC) inspections and no detentions. The most recent inspection was on 29 April 2026.
- Type: Crude Oil Tanker
- Flag: Liberia
- Year built: 2023
- MMSI: 636021090
- Call sign: 5LCF6
- Gross tonnage: 62955
- Deadweight: 115198 t
- Length overall: 249.9 m
- Beam: 44 m
- Home port: MONROVIA
- Port State Control (PSC) inspections: 5 since 2023
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 29/04/2026
- Registered owner: AMELIE MANAGEMENT LTD (Greece)
- Ship manager · ISM manager · DOC holder: DELIA TANKERS LLC (Greece)
- Last AIS position: 51°55.2′N · 003°32.5′E · Speed 0.1 kn
- Destination: Rotterdam (NL RTM) · ETA 2026-10-04T01:00:00.000Z
Frequently asked questions
What is the vessel type and age of ARACHTHOS I?
ARACHTHOS I is a Crude Oil Tanker built in 2023. It is currently in its third year of service.
What are the tonnage specifications for ARACHTHOS I?
The vessel has a deadweight tonnage of 115,198 metric tonnes. Its gross tonnage is recorded at 62,955.
Which classification society manages ARACHTHOS I?
The vessel is classed by DNV, which is an IACS member. Its current class status is listed as Delivered.
Where has ARACHTHOS I been recently observed?
The vessel has been observed in the Mediterranean Sea and the Gulf of Mexico. It has also been recorded in West Africa and along the North America East Coast.
What is the PSC inspection history for ARACHTHOS I?
Over the last 36 months it has had 3 port state control (PSC) inspections and no detentions, with 1 deficiency recorded. The most recent inspection was on 29 April 2026. All-time records show 5 inspections since 2023 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.