DAQING KNUTSEN (IMO 9914656)
DAQING KNUTSEN is a Crude Oil Tanker built in 2022 and flying the Norway (NIS) flag, placing it in its fourth year of service. The vessel reports a deadweight tonnage of 154,955 metric tonnes, a gross tonnage of 89,754, and a length overall of 278.909 metres. This tanker is configured for significant crude oil transport operations. DAQING KNUTSEN is classed by DNV, which is a member of the International Association of Classification Societies (IACS). The vessel has been observed in the South America East Coast region. It has a history involving one former name and one former flag state. No port state control (PSC) inspections were recorded in the last 36 months; 1 inspection is on file since 2023, the most recent on 30 June 2023.
- Type: Crude Oil Tanker
- Flag: Norway (NIS)
- Year built: 2022
- MMSI: 259126000
- Call sign: LANG8
- Gross tonnage: 89754
- Deadweight: 154955 t
- Length overall: 278.909 m
- Beam: 46.992 m
- Home port: HAUGESUND
- Port State Control (PSC) inspections: 1 since 2023
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 30/06/2023
- Registered owner: KNOT SHUTTLE TANKERS 37 AS (Norway)
- Ship manager · ISM manager · DOC holder: KNOT MANAGEMENT AS (Norway)
- Last AIS position: 23°4.8′S · 044°27.8′W · Speed 0.3 kn · at anchor · received 17 October 2026 at 03:07 UTC
- Destination: Angra dos Reis (BR ADR)
Frequently asked questions
What is the vessel type and build year of DAQING KNUTSEN?
DAQING KNUTSEN is a Crude Oil Tanker built in 2022. It is currently in its fourth year of service.
What are the primary dimensions of the vessel?
The vessel has a length overall of 278.909 metres and a beam of 46.992 metres. It operates with a maximum draught of 17.3 metres.
What is the deadweight capacity of DAQING KNUTSEN?
The vessel reports a deadweight tonnage of 154,955 metric tonnes. Its gross tonnage is recorded at 89,754.
Which classification society maintains DAQING KNUTSEN?
The vessel is classed by DNV, which is an IACS member. Its current classification status is listed as Delivered.
How many port-state inspections has the vessel undergone?
No port state control (PSC) inspections were recorded in the last 36 months; 1 inspection is on file since 2023, the most recent on 30 June 2023.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.