FJ CAMELIA (IMO 9911769)
FJ CAMELIA is a Bulk Carrier built in 2021 and flying the Marshall Islands flag, placing it in its fifth year of service. The vessel reports a deadweight tonnage of 82,501 metric tonnes and a gross tonnage of 44,318. This vessel is configured for bulk cargo operations within the global maritime trade network.
FJ CAMELIA is classed by Nippon Kaiji Kyokai, which is an IACS member. The vessel has been observed in the Singapore Strait, South East Asia, and South Asia over recent periods. It has previously operated under one former name and one former flag. Over the last 36 months it has had 5 port state control (PSC) inspections and no detentions. The most recent inspection was on 10 August 2026.
- Type: Bulk Carrier
- Flag: Marshall Islands
- Year built: 2021
- MMSI: 538009555
- Call sign: V7A4884
- Gross tonnage: 44318
- Deadweight: 82501 t
- Port State Control (PSC) inspections: 9 since 2021
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 10/08/2026
- Registered owner: FJ LINES INC (Japan)
- Ship manager · ISM manager: FUKUJIN KISEN KK (Japan)
- Last AIS position: 27°17.1′S · 034°50.6′E · Speed 11.3 kn
- Destination: To be nominated · ETA 2026-10-13T08:00:00.000Z
Frequently asked questions
What is the vessel type and age of FJ CAMELIA?
FJ CAMELIA is a Bulk Carrier built in 2021. It is currently in its fifth year of service.
What are the capacity specifications for FJ CAMELIA?
The vessel has a deadweight tonnage of 82,501 metric tonnes. Its gross tonnage is recorded at 44,318.
Which classification society maintains FJ CAMELIA?
The vessel is classed by Nippon Kaiji Kyokai. This society is a member of the International Association of Classification Societies (IACS).
Where has FJ CAMELIA been recently observed?
The vessel has been spotted in the Singapore Strait and throughout South East Asia. It has also been observed operating in South Asia.
What is the PSC inspection history for FJ CAMELIA?
Over the last 36 months it has had 5 port state control (PSC) inspections and no detentions, with 6 deficiencies recorded. The most recent inspection was on 10 August 2026. All-time records show 9 inspections since 2021 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.