SUN PRINCESS (IMO 9863118)
SUN PRINCESS is a Passenger (Cruise) Ship built in 2024 and flying the Bermuda flag, placing it in its second year of service. The vessel reports a gross tonnage of 177,882 and a deadweight tonnage of 18,818. This large-scale passenger vessel is designed for high-capacity cruise operations. SUN PRINCESS is classed by Lloyd's Register, which is an IACS member. The vessel has been observed in the Mediterranean Sea, Middle America and the Gulf of Mexico, and West Africa. It has previously operated under one former name and one former flag. Over the last 36 months it has had 6 port state control (PSC) inspections and no detentions. The most recent inspection was on 3 February 2026.
- Type: Passenger (Cruise) Ship
- Flag: Bermuda
- Year built: 2024
- MMSI: 310841000
- Call sign: ZCHD6
- Gross tonnage: 177882
- Deadweight: 18818 t
- Port State Control (PSC) inspections: 7 since 2023
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 03/02/2026
- Registered owner: SUN PRINCESS LTD (USA)
- Ship manager · ISM manager: PRINCESS CRUISE LINES LTD (USA)
- Last AIS position: 42°51.7′N · 005°40.8′E · Speed 14.6 kn · under way · received 13 October 2026 at 18:09 UTC
- Destination: Ajaccio (FR AJA) · ETA 14 October 2026 at 05:20 UTC (as broadcast by the vessel)
- Arrival alert: rynda.io messages you by email or in Telegram when SUN PRINCESS arrives in Ajaccio. Free for up to 3 vessels.
Frequently asked questions
What type of vessel is SUN PRINCESS?
SUN PRINCESS is a Passenger (Cruise) Ship. It was built in 2024 and is currently in its second year of service.
What is the gross tonnage of SUN PRINCESS?
The vessel reports a gross tonnage of 177,882. It also has a deadweight tonnage of 18,818 metric tonnes.
Which classification society manages SUN PRINCESS?
The vessel is classed by Lloyd's Register. This society is a member of the International Association of Classification Societies (IACS).
Where has SUN PRINCESS been operating recently?
The vessel has been observed in the Mediterranean Sea and the Gulf of Mexico. It has also been recorded in West African waters.
How many inspections has the vessel undergone?
Over the last 36 months it has had 6 port state control (PSC) inspections and no detentions, with 6 deficiencies recorded. The most recent inspection was on 3 February 2026. All-time records show 7 inspections since 2023 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.