ARISTOS I (IMO 9862891)
ARISTOS I is a LNG Tanker built in 2020 and flying the Malta flag, placing it in its sixth year of service. The vessel reports a deadweight tonnage of 93,448 metric tonnes, a gross tonnage of 116,581, and a length overall of 299 metres. This vessel is configured for the transport of liquefied natural gas.
ARISTOS I is classed by Lloyd's Register, which is an IACS member. The vessel has been observed in the Mediterranean Sea, the North America East Coast, and West Africa over recent periods. It has previously operated under one former name and one former flag. Over the last 36 months it has had 6 port state control (PSC) inspections and no detentions. The most recent inspection was on 25 August 2026.
- Type: LNG Tanker
- Flag: Malta
- Year built: 2020
- MMSI: 215668000
- Call sign: 9HA5241
- Gross tonnage: 116581
- Deadweight: 93448 t
- Length overall: 299 m
- Beam: 46 m
- Port State Control (PSC) inspections: 9 since 2021
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 25/08/2026
- Registered owner: XIANG CH25 HK INTERNATIONAL (Greece)
- Ship manager · ISM manager: CAPITAL GAS SHIP MANAGEMENT (Greece)
- Last AIS position: 25°35.7′N · 079°33.9′W · Speed 12.7 kn
- Destination: Corpus Christi (US CRP) · ETA 2026-10-10T11:00:00.000Z
Frequently asked questions
What is the vessel type and age of ARISTOS I?
ARISTOS I is an LNG Tanker built in 2020. It is currently in its sixth year of service.
What are the dimensions of ARISTOS I?
The vessel has a length overall of 299 metres and a beam of 46 metres. It has a gross tonnage of 116,581.
Which classification society manages ARISTOS I?
The vessel is classed by Lloyd's Register, which is an IACS member. Its current class status is listed as Delivered.
Where has ARISTOS I been recently observed?
The vessel has been observed in the Mediterranean Sea, West Africa, and the North America East Coast. These regions represent its recent operational areas.
What is the PSC inspection history for ARISTOS I?
Over the last 36 months it has had 6 port state control (PSC) inspections and no detentions, with no deficiencies recorded. The most recent inspection was on 25 August 2026. All-time records show 9 inspections since 2021 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.