RG RHEA (IMO 9855604)
RG RHEA is a Bulk Carrier built in 2020 and flying the Marshall Islands flag, placing it in its sixth year of service. The vessel reports a deadweight tonnage of 81,577, a gross tonnage of 44,000, and no length overall is specified. This vessel is configured for bulk cargo operations within the global maritime trade.
RG RHEA is classed by Lloyd's Register, which is an IACS member. The vessel has been observed in East Asia, East Africa, and the East Coast of South America. It has previously operated under two former names and two different flag states. Over the last 36 months it has had 11 port state control (PSC) inspections and no detentions. The most recent inspection was on 31 July 2026.
- Type: Bulk Carrier
- Flag: Marshall Islands
- Year built: 2020
- MMSI: 538011217
- Call sign: V7A6803
- Gross tonnage: 44000
- Deadweight: 81577 t
- Length overall: 229 m
- Beam: 32 m
- Port State Control (PSC) inspections: 16 since 2020
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 31/07/2026
- Registered owner: ZHE YIN HANGZHOU NO 32 (China)
- Ship manager: REACHY INTERNATIONAL HK (China)
- ISM manager: CHINAWELL SHIPPING LTD (China)
- Last AIS position: 40°57.4′N · 066°8.2′W · Speed 11.2 kn
- Destination: Baltimore (US BAL) · ETA 2026-10-10T08:47:00.000Z
Frequently asked questions
What is the vessel type and age of RG RHEA?
RG RHEA is a Bulk Carrier built in 2020. It is currently in its sixth year of service.
What are the capacity specifications for RG RHEA?
The vessel has a deadweight tonnage of 81,577. Its gross tonnage is recorded at 44,000.
Which classification society manages RG RHEA?
The vessel is classed by Lloyd's Register. This society is a recognized member of the International Association of Classification Societies (IACS).
Where has RG RHEA been recently operating?
The vessel has been observed in East Asia, East Africa, and the East Coast of South America. These regions represent its most recent geographic activity.
What is the PSC inspection history for RG RHEA?
Over the last 36 months it has had 11 port state control (PSC) inspections and no detentions, with 21 deficiencies recorded. The most recent inspection was on 31 July 2026. All-time records show 16 inspections since 2020 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.