EVER FOREVER (IMO 9850575)
EVER FOREVER is a Container Ship built in 2020 and flying the Panama flag, placing it in its sixth year of service. The vessel reports a deadweight tonnage of 127,076 metric tonnes and a gross tonnage of 117,340. This capacity is characteristic of large-scale containerized cargo operations. EVER FOREVER is classed by the American Bureau of Shipping, which is an IACS member. The vessel has been observed in East Asia, the North America West Coast, and the Gulf of Mexico over recent periods. It has previously operated under one former name and one former flag. Over the last 36 months it has had 10 port state control (PSC) inspections and 1 detention. The most recent inspection was on 10 July 2026.
- Type: Container Ship
- Flag: Panama
- Year built: 2020
- MMSI: 351571000
- Call sign: H3WC
- Gross tonnage: 117340
- Deadweight: 127076 t
- Port State Control (PSC) inspections: 16 since 2021
- PSC detentions in the last 36 months: 1
- Last PSC detention: 22/05/2026, Qingdao (Tokyo MoU)
- Last PSC inspection: 10/07/2026
- Registered owner: GREENCOMPASS MARINE SA
- Ship manager · ISM manager: EVERGREEN MARINE CORP
- Last AIS position: 39°15.1′N · 076°32.6′W · Speed 0.0 kn · moored · received 12 October 2026 at 02:25 UTC
- Destination: Baltimore (US BAL)
Frequently asked questions
What is the vessel type and age of EVER FOREVER?
EVER FOREVER is a container ship built in 2020. It is currently in its sixth year of service.
What are the tonnage specifications for EVER FOREVER?
The vessel has a deadweight tonnage of 127,076 metric tonnes. Its gross tonnage is recorded at 117,340.
Which classification society manages EVER FOREVER?
The vessel is classed by the American Bureau of Shipping. This society is a member of the International Association of Classification Societies (IACS).
Where has EVER FOREVER been recently observed?
The vessel has been seen in East Asia and the North America West Coast. It has also been observed in the Middle America and Gulf of Mexico regions.
What is the PSC inspection history for EVER FOREVER?
Over the last 36 months it has had 10 port state control (PSC) inspections and 1 detention, with 12 deficiencies recorded. The most recent inspection was on 10 July 2026. All-time records show 16 inspections since 2021 and 1 detention. The most recent detention was on 22 May 2026.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.