ADNOC S-01 (IMO 9709142)
ADNOC S-01 is an Offshore Supply Ship built in 2015 and flying the United Arab Emirates flag, placing it in its 11th year of service. The vessel reports a deadweight tonnage of 3,757 metric tonnes and a gross tonnage of 3,120. This vessel is configured for offshore support operations. ADNOC S-01 is classed by Lloyd's Register, which is a member of the International Association of Classification Societies (IACS). The vessel has been observed in the South Asia region. It has previously operated under two different names and two different flag states. No port state control (PSC) inspections were recorded in the last 36 months; 1 inspection is on file since 2015, the most recent on 10 December 2015.
- Type: Offshore Supply Ship
- Flag: United Arab Emirates
- Year built: 2015
- MMSI: 471253000
- Call sign: A6E2073
- Gross tonnage: 3120
- Deadweight: 3757 t
- Port State Control (PSC) inspections: 1 since 2015
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 10/12/2015
- Registered owner: AL GAFAI MARINE SERVICES CO (United Arab Emirates)
- Ship manager · ISM manager: ADNOC LOGISTICS & SERVICES (United Arab Emirates)
- Last AIS position: 25°11.8′N · 053°7.5′E · Speed 0.1 kn · under way · received 10 October 2026 at 00:14 UTC
- Destination: UMM SHAIF FIELD
Frequently asked questions
What type of vessel is ADNOC S-01?
ADNOC S-01 is an Offshore Supply Ship. It was built in 2015 and is currently in its 11th year of service.
What are the tonnage specifications for ADNOC S-01?
The vessel has a deadweight tonnage of 3,757 metric tonnes. Its gross tonnage is recorded at 3,120.
Which classification society maintains ADNOC S-01?
The vessel is classed by Lloyd's Register. This society is a member of the International Association of Classification Societies (IACS).
Where has ADNOC S-01 been operating recently?
The vessel has been observed in the South Asia region. This is the primary geographic area noted in recent data.
How many port-state inspections has the vessel undergone?
No port state control (PSC) inspections were recorded in the last 36 months; 1 inspection is on file since 2015, the most recent on 10 December 2015.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.