MULTRATUG 26 (IMO 9667863)
MULTRATUG 26 is a Tug built in 2013 and flying the Netherlands flag, placing it in its 13th year of service. The vessel reports a deadweight tonnage of 160 metric tonnes and a gross tonnage of 294. This small-scale tonnage is characteristic of specialized tug vessels used for harbor and coastal operations. MULTRATUG 26 is classed by Lloyd's Register, which is a member of the International Association of Classification Societies (IACS). The vessel has been observed operating in the Mediterranean Sea. It has previously operated under one former name and two different flag states. Over the last 36 months it has had 3 port state control (PSC) inspections and no detentions. The most recent inspection was on 30 June 2026.
- Type: Tug
- Flag: Netherlands
- Year built: 2013
- MMSI: 244790985
- Call sign: PCWE
- Gross tonnage: 294
- Deadweight: 160 t
- Length overall: 28 m
- Beam: 10 m
- Port State Control (PSC) inspections: 8 since 2017
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 30/06/2026
- Registered owner · Ship manager: MULTRASHIP TOWAGE & SALVAGE BV (Netherlands)
- Last AIS position: 42°29.3′N · 027°28.8′E · Speed 0.0 kn · moored · received 18 October 2026 at 14:47 UTC
- Destination: Burgas (BG BOJ)
Frequently asked questions
What is the vessel type and age of MULTRATUG 26?
MULTRATUG 26 is a Tug vessel. It was built in 2013 and is currently in its 13th year of service.
What are the tonnage specifications for MULTRATUG 26?
The vessel has a gross tonnage of 294. It also reports a deadweight tonnage of 160 metric tonnes.
Which classification society manages MULTRATUG 26?
The vessel is classed by Lloyd's Register. This society is a recognized member of the International Association of Classification Societies (IACS).
Where has MULTRATUG 26 been recently observed?
The vessel has been observed in the Mediterranean Sea. This is the primary geographic area recorded in recent data.
What is the PSC inspection history for this vessel?
Over the last 36 months it has had 3 port state control (PSC) inspections and no detentions, with 9 deficiencies recorded. The most recent inspection was on 30 June 2026. All-time records show 8 inspections since 2017 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.