VESTA CEMENT (IMO 9577276)
VESTA CEMENT is a Cement Carrier built in 2010 and flying the Liberia flag, placing it in its 16th year of service. The vessel reports a deadweight tonnage of 15,053 metric tonnes, a gross tonnage of 8,559, and a length overall of 132 metres. This vessel is configured for specialized cement transport operations.
VESTA CEMENT is classed by Registro Italiano Navale, which is an IACS member. The vessel has been observed in the Mediterranean Sea over recent periods. It has been registered under three former names and has operated under two former flag states. Over the last 36 months it has had 8 port state control (PSC) inspections and 1 detention. The most recent inspection was on 7 July 2026.
- Type: Cement Carrier
- Flag: Liberia
- Year built: 2010
- MMSI: 636020381
- Call sign: D5YY6
- Gross tonnage: 8559
- Deadweight: 15053 t
- Length overall: 132 m
- Beam: 22.5 m
- Home port: MONROVIA - 20381
- Port State Control (PSC) inspections: 23 since 2014
- PSC detentions in the last 36 months: 1
- Last PSC detention: 30/01/2024, Venezia (Paris MoU)
- Last PSC inspection: 07/07/2026
- Registered owner · Ship manager: VESTA CEMENT SHIPPING LTD (Marshall Islands)
- ISM manager: INTERSHIP NAVIGATION CO-MAI (Greece)
- Last AIS position: 38°26.6′N · 027°9.6′E · Speed 0.1 kn
- Destination: Izmir (IZM) (TR IZM) · ETA 2026-10-05T15:00:00.000Z
Frequently asked questions
What is the vessel type and age of VESTA CEMENT?
VESTA CEMENT is a Cement Carrier built in 2010. It is currently in its 16th year of service.
What are the dimensions of VESTA CEMENT?
The vessel has a length overall of 132 metres and a beam of 22.5 metres. It possesses a gross tonnage of 8,559 and a deadweight of 15,053 metric tonnes.
Which classification society manages VESTA CEMENT?
The vessel is classed by Registro Italiano Navale. This society is a member of the International Association of Classification Societies (IACS).
What is the engine power of VESTA CEMENT?
The vessel is equipped with a main engine rated at 5,000 kW. This power output supports its operations as a specialized cement carrier.
How many PSC inspections has VESTA CEMENT undergone?
Over the last 36 months it has had 8 port state control (PSC) inspections and 1 detention, with 23 deficiencies recorded. The most recent inspection was on 7 July 2026. All-time records show 23 inspections since 2014 and 1 detention. The most recent detention was on 30 January 2024.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.