MERAIO (IMO 9502817)
MERAIO is a Bulk Carrier built in 2011 and flying the Belize flag, placing it in its 15th year of service. The vessel reports a deadweight tonnage of 35,214 metric tonnes and a gross tonnage of 22,402. Given its specifications, it is configured for regional bulk cargo transport.
Nippon Kaiji Kyokai (IACS) is the classification society for the vessel, which is an IACS member. The vessel has been observed in the Mediterranean Sea, North Europe, and West Europe. It has operated under three former names and three former flags. Over the last 36 months it has had 12 port state control (PSC) inspections and no detentions. The most recent inspection was on 15 September 2026.
- Type: Bulk Carrier
- Flag: Belize
- Year built: 2011
- MMSI: 312791000
- Call sign: V3NM7
- Gross tonnage: 22402
- Deadweight: 35214 t
- Length overall: 180 m
- Beam: 28 m
- Port State Control (PSC) inspections: 56 since 2011
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 15/09/2026
- Registered owner: AMARELLA SHIPPING LTD (Lebanon)
- Ship manager · ISM manager: ATHENAI MANAGEMENT SAL (Lebanon)
- Last AIS position: 28°1.4′N · 013°35.4′W · Speed 10.9 kn
- Destination: LYMRA · ETA 2026-10-14T06:00:00.000Z
Frequently asked questions
What is the vessel type and age of MERAIO?
MERAIO is a Bulk Carrier built in 2011. It is currently in its 15th year of service.
What are the capacity specifications for MERAIO?
The vessel has a deadweight tonnage of 35,214 metric tonnes. Its gross tonnage is recorded at 22,402.
Which classification society manages MERAIO?
The vessel is classed by Nippon Kaiji Kyokai, which is an IACS member. Its current class status is Delivered.
Where has MERAIO been recently observed?
The vessel has been observed in the Mediterranean Sea, North Europe, and West Europe. These regions represent its most recent geographic activity.
What is the PSC inspection history for MERAIO?
Over the last 36 months it has had 12 port state control (PSC) inspections and no detentions; the deficiency count is reported for 10 of them. The most recent inspection was on 15 September 2026. All-time records show 56 inspections since 2011 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.