HIGHLINE 51 (IMO 9428164)
HIGHLINE 51 is a Tug built in 2007 and flying the Malaysia flag, placing it in its 19th year of service. The vessel reports a deadweight tonnage of 276 metric tonnes, a gross tonnage of 267, and a length overall of 29 metres. This small-scale vessel is configured for specialized towing and harbor assistance operations. HIGHLINE 51 is classed by Bureau Veritas, which is a member of the International Association of Classification Societies. The vessel has been observed in South East Asia, the Java Sea, and the Singapore Strait. It has previously operated under one former name and one former flag. Over the last 36 months it has had 3 port state control (PSC) inspections and no detentions. The most recent inspection was on 31 July 2026.
- Type: Tug
- Flag: Malaysia
- Year built: 2007
- MMSI: 533000518
- Call sign: 9WGV5
- Gross tonnage: 267
- Deadweight: 276 t
- Length overall: 29 m
- Beam: 8 m
- Port State Control (PSC) inspections: 12 since 2012
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 31/07/2026
- Registered owner: HIGHLINE EQUITY SDN BHD (Malaysia)
- Ship manager: HIGHLINE SHIPPING SDN BHD (Malaysia)
- Last AIS position: 10°11.8′N · 107°8.0′E · Speed 6.0 kn · under way · received 7 October 2026 at 02:12 UTC
- Destination: VUNGTAU VN
- Arrival alert: rynda.io messages you by email or in Telegram when HIGHLINE 51 arrives in port. Free for up to 3 vessels.
Frequently asked questions
What is the vessel type and age of HIGHLINE 51?
HIGHLINE 51 is a Tug built in 2007. It is currently in its 19th year of service.
What are the dimensions of HIGHLINE 51?
The vessel has a length overall of 29 metres and a beam of 9 metres. It reports a gross tonnage of 267.
Which classification society manages HIGHLINE 51?
The vessel is classed by Bureau Veritas. This society is a recognized member of the International Association of Classification Societies (IACS).
Where has HIGHLINE 51 been operating recently?
The vessel has been observed in the Singapore Strait, the Java Sea, and South East Asia. These areas represent its most recent geographic activity.
What is the PSC inspection history for HIGHLINE 51?
Over the last 36 months it has had 3 port state control (PSC) inspections and no detentions; the deficiency count is reported for 2 of them. The most recent inspection was on 31 July 2026. All-time records show 12 inspections since 2012 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.