AZOV CONCEPT (IMO 9345726)
AZOV CONCEPT is a General Cargo Ship built in 2006 and flying the St Vincent and Grenadines flag, placing it in its 20th year of service. The vessel reports a deadweight tonnage of 8,048 metric tonnes and a gross tonnage of 6,529. This size and type suggest its utility in regional cargo transport and general freight operations. AZOV CONCEPT is classed by Bureau Veritas, which is a member of the International Association of Classification Societies (IACS). The vessel has been observed operating in the Mediterranean Sea. It has previously operated under three different flag states and has been registered under one former name. Over the last 36 months it has had 8 port state control (PSC) inspections and no detentions. The most recent inspection was on 23 June 2026.
- Type: General Cargo Ship
- Flag: St Vincent and Grenadines
- Year built: 2006
- MMSI: 377726000
- Call sign: J8B6787
- Gross tonnage: 6529
- Deadweight: 8048 t
- Length overall: 142 m
- Beam: 18 m
- Port State Control (PSC) inspections: 49 since 2006
- PSC detentions in the last 36 months: 0
- Last PSC detention: 02/06/2021, Yeysk (Paris MoU)
- Last PSC inspection: 23/06/2026
- Registered owner: UGAZAN MARITIME LTD (Turkey)
- Ship manager: ALBROS SHIPPING & TRADING CO (Turkey)
- ISM manager: SARFO DENIZCILIK VE TICARET AS (Turkey)
- Last AIS position: 42°29.3′N · 027°27.4′E · Speed 0.0 kn · moored · received 18 October 2026 at 18:28 UTC
- Destination: Burgas (BG BOJ)
Frequently asked questions
What is the vessel type and age of AZOV CONCEPT?
AZOV CONCEPT is a General Cargo Ship built in 2006. It is currently in its 20th year of service.
What are the tonnage specifications for AZOV CONCEPT?
The vessel has a deadweight tonnage of 8,048 metric tonnes. Its gross tonnage is recorded at 6,529.
Which classification society manages AZOV CONCEPT?
The vessel is classed by Bureau Veritas, which is an IACS member. Its current classification status is listed as Delivered.
Where has AZOV CONCEPT been operating recently?
The vessel has been observed in the Mediterranean Sea. This region is one of the primary areas noted in its recent geographic activity.
How many port-state inspections has the vessel undergone?
Over the last 36 months it has had 8 port state control (PSC) inspections and no detentions, with 14 deficiencies recorded. The most recent inspection was on 23 June 2026. All-time records show 49 inspections since 2006 and 1 detention. The most recent detention was on 2 June 2021.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.