H&O ONE (IMO 9181807)
FU XING is a General Cargo Ship built in 1998 and flying the Belize flag, placing it in its 28th year of service. The vessel reports a deadweight tonnage of 8,555 metric tonnes and a gross tonnage of 6,178. This size and type suggest its utility in regional cargo transport operations. FU XING is classed by Intermaritime Certification Services, S.A., which is not an IACS member. The vessel has been observed in South East Asia, East Asia, and the Java Sea and Singapore Strait. It has previously operated under two different flag states and has been known by four former names. Over the last 36 months it has had 15 port state control (PSC) inspections and 1 detention. The most recent inspection was on 2 January 2026.
- Type: General Cargo Ship
- Flag: Comoros
- Year built: 1998
- MMSI: 620800365
- Call sign: D6A4365
- Gross tonnage: 6178
- Deadweight: 8555 t
- Length overall: 100 m
- Beam: 18 m
- Port State Control (PSC) inspections: 117 since 2000
- PSC detentions in the last 36 months: 1
- Last PSC detention: 21/10/2024, Shanghai (Tokyo MoU)
- Last PSC inspection: 02/01/2026
- Registered owner · Ship manager: BAWABT AL TAWASOL GENERAL TRDG
- Last AIS position: 5°23.9′N · 100°21.0′E · at anchor · received 6 July 2026 at 21:35 UTC
- Destination: Penang (Georgetown) (MY PEN)
Frequently asked questions
What is the vessel type and age of FU XING?
FU XING is a General Cargo Ship built in 1998. It is currently in its 28th year of service.
What are the tonnage specifications for FU XING?
The vessel has a deadweight tonnage of 8,555 metric tonnes. Its gross tonnage is recorded at 6,178.
Which classification society manages FU XING?
The vessel is classed by Intermaritime Certification Services, S.A. This society is not listed as an IACS member.
Where has FU XING been recently observed?
The vessel has been observed in South East Asia and East Asia. It has also been recorded in the Java Sea and Singapore Strait.
What is the PSC inspection history for FU XING?
Over the last 36 months it has had 15 port state control (PSC) inspections and 1 detention, with 45 deficiencies recorded. The most recent inspection was on 2 January 2026. All-time records show 117 inspections since 2000 and 7 detentions. The most recent detention was on 21 October 2024.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.