STOLT EFFORT (IMO 9178202)
STOLT EFFORT is a Chemical/Oil Products Tanker built in 1999 and flying the Cayman Islands flag, placing it in its 27th year of service. The vessel reports a deadweight tonnage of 37,155 metric tonnes, a gross tonnage of 24,509, and a length overall of 176.75 metres. This vessel is configured for the transport of chemical and oil products. The vessel's classification notation includes Tanker for chemicals and oil products E0 ESP ETC HL(1.25,1.85) LCS(D, I, S). Recent observation data places the vessel in East Asia, the Gulf of Mexico, and along the North America East Coast. It has previously operated under one former name and one former flag. Over the last 36 months it has had 5 port state control (PSC) inspections and no detentions. The most recent inspection was on 13 August 2026.
- Type: Chemical/Oil Products Tanker
- Flag: Cayman Islands
- Year built: 1999
- MMSI: 319445000
- Call sign: ZCSP6
- Gross tonnage: 24509
- Deadweight: 37155 t
- Length overall: 176.75 m
- Beam: 31 m
- Home port: GEORGE TOWN
- Port State Control (PSC) inspections: 64 since 1999
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 13/08/2026
- Registered owner: STOLT EFFORT BV (Netherlands)
- Ship manager · ISM manager · DOC holder: STOLT TANKERS BV (Netherlands)
- Last AIS position: 49°30.5′N · 000°1.5′W · Speed 14.2 kn · under way · received 10 October 2026 at 19:45 UTC
- Destination: Le Havre (FR LEH)
- Arrival alert: rynda.io messages you by email or in Telegram when STOLT EFFORT arrives in Le Havre. Free for up to 3 vessels.
Frequently asked questions
What are the dimensions of STOLT EFFORT?
The vessel has a length overall of 176.75 metres and a beam of 31 metres. It operates with a maximum draught of 11.886 metres.
What is the cargo capacity of STOLT EFFORT?
The vessel reports a deadweight tonnage of 37,155 metric tonnes. Its gross tonnage is recorded at 24,509.
Which flag does the vessel fly?
STOLT EFFORT currently flies the Cayman Islands flag. It has operated under one former flag state during its service history.
How many PSC inspections has the vessel undergone?
Over the last 36 months it has had 5 port state control (PSC) inspections and no detentions, with 7 deficiencies recorded. The most recent inspection was on 13 August 2026. All-time records show 64 inspections since 1999 and no detentions.
Who built the STOLT EFFORT?
The vessel was built by Danyard A/S in 1999. It is currently in its 27th year of service.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.