EAGLE (IMO 8990940)
EAGLE is a Pusher Tug built in 1984 and flying the United States of America flag, placing it in its 42nd year of service. The vessel reports a gross tonnage of 141 and a length overall of 143 metres. Given its configuration as a pusher tug, it is designed for specialized towing and pushing operations. The vessel is currently classed by Other, which is not an IACS member. It has been observed in the North America East Coast and Middle America and Gulf of Mexico regions. The vessel has operated under one former flag and has been registered under three former names. Over the last 36 months it has had 1 port state control (PSC) inspection and no detentions. The most recent inspection was on 11 May 2026.
- Type: Pusher Tug
- Flag: United States of America
- Year built: 1984
- MMSI: 367620140
- Call sign: WDH4673
- Gross tonnage: 141
- Deadweight: 0 t
- Length overall: 143 m
- Beam: 23 m
- Port State Control (PSC) inspections: 1 since 2026
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 11/05/2026
- Registered owner · Ship manager: HFL 412 MARINE INC (USA)
- Last AIS position: 40°26.3′N · 080°0.6′W · Speed 7.0 kn · under way · received 29 September 2026 at 02:52 UTC
- Destination: 0BJW
- Arrival alert: rynda.io messages you by email or in Telegram when EAGLE arrives in port. Free for up to 3 vessels.
Frequently asked questions
What is the vessel type of EAGLE?
EAGLE is a Pusher Tug. It was built in 1984 and is currently in its 42nd year of service.
What are the dimensions of EAGLE?
The vessel has a length overall of 143 metres. It also features a beam width of 23 metres.
What is the gross tonnage of EAGLE?
The vessel reports a gross tonnage of 141. There is no deadweight tonnage recorded for this unit.
Where has EAGLE been operating recently?
The vessel has been observed in the North America East Coast and Middle America and Gulf of Mexico. These regions represent its most recent recorded geographic activity.
How many inspections has EAGLE undergone?
Over the last 36 months it has had 1 port state control (PSC) inspection and no detentions, with no deficiencies recorded. The most recent inspection was on 11 May 2026. All-time records show 1 inspection since 2026 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.