ROAA QUEEN (IMO 8406779)
ROAA QUEEN is a General Cargo Ship built in 1985 and flying the Comoros flag, placing it in its 41st year of service. The vessel reports a deadweight tonnage of 3,658 metric tonnes and a gross tonnage of 2,932. Given its capacity and type, it is configured for general cargo operations. ROAA QUEEN is classed by Dromon Bureau of Shipping. The vessel has been observed in the Mediterranean Sea over recent periods. It has a history of operating under 9 different flags and has been known by 6 former names. Over the last 36 months it has had 8 port state control (PSC) inspections and 3 detentions. The most recent inspection was on 18 June 2026.
- Type: General Cargo Ship
- Flag: Comoros
- Year built: 1985
- MMSI: 620999636
- Call sign: D6A3650
- Gross tonnage: 2932
- Deadweight: 3658 t
- Port State Control (PSC) inspections: 52 since 1998
- PSC detentions in the last 36 months: 3
- Last PSC detention: 02/02/2026, Zonguldak (Black Sea MoU)
- Last PSC inspection: 18/06/2026
- Registered owner · Ship manager: MELODY MARINE LTD (Liberia)
- ISM manager: ADNAN DENIZCILIK VE TICARET (Turkey)
- Last AIS position: 44°9.5′N · 028°39.4′E · Speed 5.5 kn · under way · received 9 October 2026 at 06:19 UTC
- Destination: Constanta (RO CND)
- Arrival alert: rynda.io messages you by email or in Telegram when ROAA QUEEN arrives in Constanta. Free for up to 3 vessels.
Frequently asked questions
What is the vessel type and age of ROAA QUEEN?
ROAA QUEEN is a General Cargo Ship built in 1985. It is currently in its 41st year of service.
What are the tonnage specifications for ROAA QUEEN?
The vessel has a deadweight tonnage of 3,658 metric tonnes. Its gross tonnage is recorded at 2,932.
Which classification society manages ROAA QUEEN?
The vessel is classed by Dromon Bureau of Shipping. Its current classification status is listed as Delivered.
Where has ROAA QUEEN been operating recently?
The vessel has been observed in the Mediterranean Sea. This region is one of the primary areas noted in its recent geographic activity.
How many PSC inspections has the vessel undergone?
Over the last 36 months it has had 8 port state control (PSC) inspections and 3 detentions, with 87 deficiencies recorded. The most recent inspection was on 18 June 2026. All-time records show 52 inspections since 1998 and 5 detentions. The most recent detention was on 2 February 2026.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.