PHIDIAS (IMO 1087081)
PHIDIAS is a Bulk Carrier built in 2026 and flying the Marshall Islands flag, placing it in its 0 year of service. The vessel reports a deadweight tonnage of 64,000 metric tonnes, a gross tonnage of 36,800, and a length overall of 199 metres. This vessel is configured for bulk cargo operations within its specified tonnage class. No classification society or IACS membership data is currently available for this vessel. Recent observation data places the vessel in the East Asia region. It has previously been registered under two different names and has operated under one earlier flag state. Over the last 36 months it has had 1 port state control (PSC) inspection and no detentions. The most recent inspection was on 6 July 2026.
- Type: Bulk Carrier
- Flag: Marshall Islands
- Year built: 2026
- MMSI: 538012489
- Call sign: V7B2933
- Gross tonnage: 36455
- Deadweight: 64064 t
- Length overall: 199 m
- Beam: 32 m
- Port State Control (PSC) inspections: 1 since 2026
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 06/07/2026
- Registered owner: MYRTOS SHIPPING SA (Greece)
- Ship manager · ISM manager: NAVINA MARITIME SA (Greece)
- Last AIS position: 39°51.2′N · 075°14.0′W · Speed 0.0 kn · moored · received 19 October 2026 at 19:13 UTC
- Destination: Paulsboro (US PAU)
Frequently asked questions
What is the vessel type and age of PHIDIAS?
PHIDIAS is a Bulk Carrier built in 2026. It is currently in its first year of service.
What are the dimensions of PHIDIAS?
The vessel has a length overall of 199 metres. It also features a beam of 32 metres.
What is the cargo capacity of PHIDIAS?
The vessel has a deadweight tonnage of 64,000 metric tonnes. Its gross tonnage is recorded at 36,800.
What is the flag state and MoU status of PHIDIAS?
PHIDIAS flies the Marshall Islands flag. It is currently assigned to the white band for both the Paris MoU and Tokyo MoU.
How many inspections has PHIDIAS undergone?
Over the last 36 months it has had 1 port state control (PSC) inspection and no detentions, with 5 deficiencies recorded. The most recent inspection was on 6 July 2026. All-time records show 1 inspection since 2026 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.