EVAGELIA (IMO 1085992)
EVAGELIA is a Bulk Carrier built in 2026 and flying the Liberia flag, placing it in its 0 year of service. The vessel reports a deadweight tonnage of 40,601 metric tonnes and a gross tonnage of 24,992. This vessel is configured for bulk cargo operations within its specific tonnage class. EVAGELIA is classed by Nippon Kaiji Kyokai, which is an IACS member. The vessel has been observed in the Singapore Strait, East Asia, and South East Asia. It has a history involving one former name and one former flag. Over the last 36 months it has had 4 port state control (PSC) inspections and no detentions. The most recent inspection was on 24 August 2026.
- Type: Bulk Carrier
- Flag: Liberia
- Year built: 2026
- MMSI: 636026119
- Call sign: A8IQ8
- Gross tonnage: 24992
- Deadweight: 40601 t
- Length overall: 183 m
- Beam: 31 m
- Port State Control (PSC) inspections: 4 since 2026
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 24/08/2026
- Registered owner: HIRAI LINE/KAHO SHIPPING (Sweden)
- Ship manager · ISM manager: DALOMAR SHIPPING SA (Greece)
- Last AIS position: 55°41.8′N · 021°7.7′E · Speed 0.0 kn · moored · received 12 October 2026 at 01:39 UTC
- Destination: Klaipeda (LT KLJ)
Frequently asked questions
What is the vessel type and age of EVAGELIA?
EVAGELIA is a Bulk Carrier built in 2026. It is currently in its first year of service.
What are the capacity specifications for EVAGELIA?
The vessel has a deadweight tonnage of 40,601 metric tonnes. Its gross tonnage is recorded at 24,992.
Which classification society manages EVAGELIA?
The vessel is classed by Nippon Kaiji Kyokai. This society is a recognized member of the International Association of Classification Societies (IACS).
Where has EVAGELIA been recently observed?
The vessel has been observed in the Singapore Strait and throughout East Asia. It has also been recorded operating in South East Asia.
What is the PSC inspection history for EVAGELIA?
Over the last 36 months it has had 4 port state control (PSC) inspections and no detentions, with 2 deficiencies recorded. The most recent inspection was on 24 August 2026. All-time records show 4 inspections since 2026 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.