NAVE ANTHOS (IMO 1059632)
NAVE ANTHOS is a Crude Oil Tanker built in 2026 and flying the Liberia flag, placing it in its 0 year of service. The vessel reports a deadweight tonnage of 116,998 metric tonnes, a gross tonnage of 64,807, and a length overall of 250 metres. This vessel is configured for large-scale crude oil transport operations. NAVE ANTHOS is classed by the American Bureau of Shipping, which is an IACS member. The vessel has been observed in the Middle America and Gulf of Mexico, North America East Coast, and East Asia regions. It has previously operated under one former name and one former flag. Over the last 36 months it has had 3 port state control (PSC) inspections and no detentions. The most recent inspection was on 26 May 2026.
- Type: Crude Oil Tanker
- Flag: Liberia
- Year built: 2026
- MMSI: 636025941
- Call sign: 5LZW4
- Gross tonnage: 64807
- Deadweight: 116998 t
- Length overall: 250 m
- Beam: 44 m
- Port State Control (PSC) inspections: 3 since 2026
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 26/05/2026
- Registered owner: HAI KUO SHIPPING 1984B LTD (Greece)
- Ship manager · ISM manager: NAVIOS TANKERS MANAGEMENT INC (Greece)
- Last AIS position: 29°45.0′N · 095°6.2′W · Speed 0.0 kn · moored · received 14 October 2026 at 10:50 UTC
- Destination: Houston (US HOU)
Frequently asked questions
What is the vessel type and capacity of NAVE ANTHOS?
NAVE ANTHOS is a Crude Oil Tanker. It has a deadweight tonnage of 116,998 metric tonnes and a gross tonnage of 64,807.
Which classification society manages NAVE ANTHOS?
The vessel is classed by the American Bureau of Shipping. This society is a member of the International Association of Classification Societies (IACS).
What are the dimensions of NAVE ANTHOS?
The vessel has a length overall of 250 metres. Its beam is recorded at 44 metres.
Where has NAVE ANTHOS been recently observed?
The vessel has been observed in the Middle America and Gulf of Mexico, North America East Coast, and East Asia. It has also been noted in South East Asia.
How many inspections has NAVE ANTHOS undergone?
Over the last 36 months it has had 3 port state control (PSC) inspections and no detentions, with 3 deficiencies recorded. The most recent inspection was on 26 May 2026. All-time records show 3 inspections since 2026 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.