NEW ACACIA (IMO 1014591)
NEW ACACIA is a Bulk Carrier built in 2024 and flying the Marshall Islands flag, placing it in its second year of service. The vessel reports a deadweight tonnage of 39,415 metric tonnes and a gross tonnage of 23,774. This size and type suggest its utility in regional dry bulk transport operations. NEW ACACIA is classed by the American Bureau of Shipping, which is a member of the International Association of Classification Societies. The vessel has been observed in the Mediterranean Sea, the Gulf of Mexico, and West Europe. It has previously operated under one former name and one former flag. Over the last 36 months it has had 9 port state control (PSC) inspections and no detentions. The most recent inspection was on 16 August 2026.
- Type: Bulk Carrier
- Flag: Marshall Islands
- Year built: 2024
- MMSI: 538011137
- Call sign: V7A6638
- Gross tonnage: 23774
- Deadweight: 39415 t
- Length overall: 180 m
- Beam: 30 m
- Port State Control (PSC) inspections: 9 since 2024
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 16/08/2026
- Registered owner · Ship manager: NEW ACACIA MARINE CO (Marshall Islands)
- ISM manager: FIBER MARINE & SHIP MANAGEMENT (Turkey)
- Last AIS position: 44°47.7′N · 009°10.3′W · Speed 11.6 kn · under way · received 11 October 2026 at 20:49 UTC
- Destination: Singapore (SG SIN) · ETA 9 November 2026 at 00:54 UTC (as broadcast by the vessel)
- Arrival alert: rynda.io messages you by email or in Telegram when NEW ACACIA arrives in Singapore. Free for up to 3 vessels.
Frequently asked questions
What is the vessel type and age of NEW ACACIA?
NEW ACACIA is a Bulk Carrier built in 2024. It is currently in its second year of service.
What are the capacity specifications for NEW ACACIA?
The vessel has a deadweight tonnage of 39,415 metric tonnes. Its gross tonnage is recorded at 23,774.
Which classification society manages NEW ACACIA?
The vessel is classed by the American Bureau of Shipping. This society is a recognized member of the International Association of Classification Societies (IACS).
Where has NEW ACACIA been operating recently?
The vessel has been observed in the Mediterranean Sea and the Gulf of Mexico. It has also been recorded in West European waters.
What is the port-state control record for NEW ACACIA?
Over the last 36 months it has had 9 port state control (PSC) inspections and no detentions, with 6 deficiencies recorded. The most recent inspection was on 16 August 2026. All-time records show 9 inspections since 2024 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.