MAN OF STEEL (IMO 1010777)
MAN OF STEEL is a Yacht built in 2010 and flying the Cayman Islands flag, placing it in its 16th year of service. The vessel reports a gross tonnage of 2,658 and a length overall of 86 metres. This size and type characterize it as a large private motor yacht. MAN OF STEEL is classed by Lloyd's Register, which is an IACS member. The vessel has been observed in the Mediterranean Sea, the North America East Coast, and the Gulf of Mexico. It has previously operated under two different names and two different flag states. Over the last 36 months it has had 1 port state control (PSC) inspection and no detentions. The most recent inspection was on 20 June 2025.
- Type: Yacht
- Flag: Cayman Islands
- Year built: 2010
- MMSI: 319729000
- Call sign: ZGAZ5
- Gross tonnage: 2658
- Deadweight: 0 t
- Length overall: 86 m
- Beam: 14 m
- Port State Control (PSC) inspections: 3 since 2017
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 20/06/2025
- Registered owner: ZEKELMAN INVESTMENTS LTD (USA)
- Ship manager: VESSEL SAFETY MANAGEMENT (USA)
- Last AIS position: 41°6.6′N · 001°14.6′E · Speed 0.0 kn · moored · received 19 October 2026 at 04:07 UTC
- Destination: Tarragona (ES TAR)
Frequently asked questions
What type of vessel is MAN OF STEEL?
MAN OF STEEL is a Yacht. It was built in 2010 and is currently in its 16th year of service.
What are the dimensions of MAN OF STEEL?
The vessel has a length overall of 86 metres. It also features a beam width of 14 metres.
Which classification society manages MAN OF STEEL?
The vessel is classed by Lloyd's Register. This society is a recognized member of the International Association of Classification Societies (IACS).
Where has MAN OF STEEL been recently observed?
The vessel has been seen in the Mediterranean Sea and the North America East Coast. It has also been recorded in the Middle America and Gulf of Mexico regions.
How many inspections has the vessel undergone?
Over the last 36 months it has had 1 port state control (PSC) inspection and no detentions, with no deficiencies recorded. The most recent inspection was on 20 June 2025. All-time records show 3 inspections since 2017 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.