PROJECT X (IMO 1010727)
PROJECT X is a yacht built in 2022 and flying the flag of Malta; it is in its 4th year of service. The vessel has a deadweight of 731 tonnes, a gross tonnage of 2,976, and a length overall of 88 metres. PROJECT X has been classed since 28 July 2022 by Bureau Veritas, a member of the International Association of Classification Societies (IACS). The vessel has been observed most often in the Mediterranean; Central America and the Gulf of Mexico; and the east coast of North America (latest area report: May 2026). It has previously sailed under one other name and one other flag. Over the last 36 months it has had 2 port state control (PSC) inspections and no detentions. The most recent inspection was on 21 May 2026.
- Type: Yacht
- Flag: Malta
- Year built: 2022
- MMSI: 229063000
- Call sign: 9HA5430
- Gross tonnage: 2976
- Deadweight: 731 t
- Length overall: 88 m
- Beam: 14 m
- Port State Control (PSC) inspections: 3 since 2022
- PSC detentions in the last 36 months: 0
- Last PSC inspection: 21/05/2026
- Registered owner: DELENA HOLDINGS LTD (Monaco)
- Ship manager · ISM manager: CAMPER & NICHOLSONS MONACO SA (Monaco)
- Last AIS position: 37°38.1′N · 024°4.3′E · Speed 11.2 kn · received 11 October 2026 at 03:30 UTC
- Destination: Vouliagméni (GR VLM) · ETA 11 October 2026 at 08:30 UTC (as broadcast by the vessel)
- Arrival alert: rynda.io messages you by email or in Telegram when PROJECT X arrives in Vouliagméni. Free for up to 3 vessels.
Frequently asked questions
What type of vessel is PROJECT X?
PROJECT X is a yacht built in 2022. It is in its 4th year of service.
What is the deadweight of PROJECT X?
PROJECT X has a deadweight of 731 tonnes. Its gross tonnage is 2,976. It measures 88 metres overall.
What flag does PROJECT X fly?
PROJECT X flies the flag of Malta. Earlier it sailed under one other flag.
Who classes PROJECT X?
PROJECT X has been classed since 28 July 2022 by Bureau Veritas, a member of the International Association of Classification Societies (IACS).
How many port state control inspections has PROJECT X had?
Over the last 36 months it has had 2 port state control (PSC) inspections and no detentions, with no deficiencies recorded. The most recent inspection was on 21 May 2026. All-time records show 3 inspections since 2022 and no detentions.
Live AIS via Rynda — combined with classification, PSC, sanctions and ownership data.