Navigational warning 16 10-P-08
Status: Cancelled · Area: ENGLAND (East Coast). Race Bank. — Works. Maritime limit. Buoyage. (Taunton, 16-1180(P)) · Source: Service Hydrographique et Océanographique de la Marine
16 10-P-08. ENGLAND (East Coast). Race Bank. — Works. Maritime limit. Buoyage. (Taunton, 16-1180(P)) 1. Work has now commenced on the construction of Race Bank Wind Farm. The main Wind Farm Array work area is marked by seven buoys as follows (ETRS89 Datum) : Buoy Type Designation Character Position North Cardinal RBWF NE Q 53 20,29 N - 0 49,43 E ; North Cardinal RBWF NORTH VQ 53 20,33 N - 0 46,10 E ; Special RBWF EAST Fl.Y.5s 53 17,53 N - 0 50,98 E ; Special RBWF SE Fl.Y.5s 53 15,70 N - 0 56,31 E ; Special RBWF SOUTH Fl.Y.5s 53 12,99 N - 0 53,46 E ; Special RBWF SW Fl.Y.5s 53 14,61 N - 0 48,46 E ; Special RBWF WEST Fl.Y.5s 53 17,76 N - 0 45,82 E. 2. All vessels should navigate with caution in the area. A safety zone of 50 metres becomes operational around each turbine as it is being installed, with a safety zone of 500 metres around the installation vessel. Cable laying to shore will also be conducted. Voir cartes GB1190, GB1503
Reference information — always verify against official Notices to Mariners before navigation.