Navigational warning 15 36-P-21

Status: Cancelled · Area: ENGLAND (West Coast). West of Duddon Sands Wind Farm. — Works. Submarine power cables. Buoyage. Wind turbines. Lights · Source: Service Hydrographique et Océanographique de la Marine

15 36-P-21. ENGLAND (West Coast). West of Duddon Sands Wind Farm. — Works. Submarine power cables. Buoyage. Wind turbines. Lights. (Taunton 15-3895(P)) 1. The construction of the West of Duddon Sands Wind Farm has been completed. There are submarine power cables connecting each turbine to the next and then to the shore near Heysham. 2. The turbines display permanent aids to navigation as follows : Designation Characteristic Fog Signal Position A03 Fl.Y.2,5s2M 53 59,36 N — 3 32,44 W ; A06 Fl.Y.5s5M 53 58,51 N — 3 31,40 W ; A09 Fl.Y.2,5s2M 53 57,65 N — 3 30,36 W ; A12 Fl.Y.5s5M Horn 30s 53 56,77 N — 3 29,28 W ; E14 Fl.Y.5s5M 53 56,71 N — 3 25,82 W ; F14 Fl.Y.5s5M 53 56,85 N — 3 25,19 W ; H13 Fl.Y.2,5s2M 53 57,45 N — 3 24,28 W ; J12 Fl.Y.5s5M Horn 30s 53 58,05 N — 3 23,37 W ; K02 Fl.Y.5s5M 54 01,15 N — 3 26,07 W ; K06 Fl.Y.5s5M 53 59,99 N — 3 24,76 W ; K10 Fl.Y.5s5M 53 58,76 N — 3 23,38 W. 3. The following light-buoys around the wind farm have been removed : Designation Characteristic Position Duddon Sands NW Q(9)15s 54 00,70 N — 3 31,47 W ; Duddon Sands W VQ(9)10s 54 00,15 N — 3 33,98 W ; Duddon Sands WSW Q(9)15s 53 58,31 N — 3 31,70 W ; Duddon Sands SE VQ(6)+LFl.10s 53 57,59 N — 3 22,82 W. 4. These changes will be included in New Editions of Chart 1826 to be published in late 2015. (ETRS89 Datum) Voir carte GB1826

Reference information — always verify against official Notices to Mariners before navigation.