Chart correction N51/20 — chart 71331
71331 12Ed. 2/13/16 LAST NM N49/20 N51/20 (Panel A) Substitute Drying height 0.4 meter [I15], drying tint and enclosing depth contour (0-meter) for depth 2.7 meters 5°19′28″N 115°20′04″E Depth 1.6 meters for 0.8 meter 5°14′26″N 115°13′52″E Add Beacon RW, Fl(2) W 15s 15M 5°24′43″N 115°14′50″E Drying height 0.1 meter [I15], drying tint and enclosing depth contour (0-meter) centered 5°17′40″N 115°18′31″E Add Submarine pipeline [L40.1] with legend “Gas CAUTION NO 1” joining 5°16′00″N 115°09′58″E 5°18′30″N 115°05′36″E 5°22′17″N 114°50′42″E (Panel B) Substitute Drying height 0.1 meter [I15], drying tint and enclosing depth contour (0-meter) for depth 0.6 meter 5°17′40″N 115°18′31″E Drying height 0.4 meter [I15], drying tint and enclosing depth contour (0-meter) for depth 2.7 meters 5°19′28″N 115°20′04″E Add Depth 0.6 meter enclosed by depth contour (2-meter) centered 5°15′59″N 115°17′48″E Depth 1.6 meters enclosed by depth contour (2-meter) centered 5°14′26″N 115°13′52″E (10(226)18 Port Klang; 40/19 Malaysia; 8(899)18 Taunton; UKHO ARCS 947-0)
Source: NGA U.S. Notice to Mariners · edition: 12Ed. 2/13/16
Reference information — always verify against official Notices to Mariners before navigation.