Heavy lift equipment
- From: North China
- To: Egypt
- Weight: 1,095 t
- Loading date: 15 October 2026
- Rate: on request
- Commission: 3.75%
- Type: Heavy lift equipment
- Source: via a broker
- Posted by: Company
Heavy lift equipment, total weight 1095 MT, volume 5340 CBM, area 2300 SQ M. Eight large units (four of 145.7-140.5 MT and four of 38.0-37.5 MT) can be shipped on deck. Remaining cargo under deck. Stackable units. Loading: 5 days (Sundays included), discharge: 5 days (Sundays excluded). Suitable as part cargo or sole cargo. Gearless vessel acceptable. LIFO or LILO basis.
Contacts open in chat after a response on rynda.io — phones and emails are never published.
All cargo on the board